The article discusses the optimization of power system operations during PSPS to reduce wildfire risk. It introduces deterministic and stochastic frameworks to analyze the impact of large wildfires on generator commitments and transmission line de-energization strategies. The study compares costs between different optimization models, highlighting the benefits of considering economic costs over operator experience in decision-making. Various constraints, such as unit commitment and operational constraints, are discussed in detail. The research emphasizes the importance of incorporating uncertainties in demand forecasts for effective decision-making.
เป็นภาษาอื่น
จากเนื้อหาต้นฉบับ
arxiv.org
ข้อมูลเชิงลึกที่สำคัญจาก
by Ryan Greenou... ที่ arxiv.org 03-18-2024
https://arxiv.org/pdf/2403.09903.pdfสอบถามเพิ่มเติม