Konsep Inti
The construction of Burj Khalifa, Dubai, required a vast and specialized array of heavy machinery, building machinery, and specialist equipment.
Abstrak
This article lists the types and quantities of machinery and materials used in the construction of Burj Khalifa, Dubai. It highlights the massive scale of the project by detailing the sheer volume of resources required.
The article is structured into three main categories:
Heavy Machinery:
- A total of 25 cranes were used, including 2 tower cranes and 22 other types.
- Other heavy machinery included excavators, bulldozers, loaders, tipper trucks, concrete pumps, concrete mixers, drilling rigs, and pile drilling machines.
Building Machinery:
- The building required 57 lifts, including high-speed lifts.
- 14 cranes were used within the building.
- Massive amounts of scaffolding, formwork, steel rebar, ready-mixed concrete, and aluminum and glass were used.
Specialist Equipment:
- Two 600m high tower cranes were specifically employed.
- Self-climbing formwork and hydraulic jacks for ground support represent some of the specialized equipment used.
Statistik
25 cranes were used in total for the Burj Khalifa construction.
14 excavators were used in the construction of Burj Khalifa.
50 tipper trucks were used in the construction of Burj Khalifa.
The Burj Khalifa utilized 57 lifts, including high-speed lifts.
15,000 tonnes of scaffolding were used in the Burj Khalifa's construction.
30,000 square meters of formwork were used in the Burj Khalifa's construction.
55,000 tons of steel rebar were used in the construction of Burj Khalifa.
330,000 cubic meters of ready-mixed concrete were used in the Burj Khalifa's construction.
103,000 square meters of aluminum and glass were used in the Burj Khalifa's construction.
Two 600m high tower cranes were used in the Burj Khalifa's construction.