A computationally tractable method to partition a set of power system contingencies into groups with similar dynamics, enabling the design of a single controller per group to maintain stability and performance after any contingency.
Abstract
The paper investigates the problem of maintaining power system stability and performance after the failure of any single line in a power system (an "N-1 contingency"). Due to the large number of possible N-1 contingencies, it is impractical to optimize controller parameters for each possible contingency a priori. The authors present a method to partition the set of contingencies into groups of contingencies that are similar to each other from a control perspective. This grouping method serves as an analysis tool to identify severe contingencies. The authors then leverage this grouping method to design controllers to handle all contingencies in a computationally tractable manner. The key steps are: Define distance metrics to measure similarity between contingencies, including frequency response, step response, and perturbation spectral norm. Apply clustering algorithms like k-centers, k-medoids, and divisive clustering to group the contingencies based on the distance metrics. Design a single controller for each group of contingencies to minimize the worst-case H-infinity or H-2 norm across the group. The authors demonstrate the effectiveness of this approach through simulation on the IEEE 39-bus and 68-bus power systems. They show that with controllers designed for a relatively small number of groups, power system stability can be significantly improved after an N-1 contingency compared to continued use of the nominal controller, and the performance is comparable to that of controllers designed for each contingency individually.
Stats
The highest H-infinity norm seen using the nominal controller on the IEEE 39-bus system is 0.202. The highest H-infinity norm seen using the step response and k-medoids grouping method on the IEEE 39-bus system is 0.152. The highest H-infinity norm seen using the nominal controller on the IEEE 68-bus system is 0.262. The highest H-infinity norm seen using the step response and k-medoids grouping method on the IEEE 68-bus system is 0.123.
Quotes
"The choice of number of groups tunes a trade-off between computation time and controller performance for a given set of contingencies." "Designing one controller per group reduces the number of controllers that need to be synthesized to handle all contingencies since there need only be as many controllers as there are groups."

Key Insights Distilled From

by Neelay Junna... at arxiv.org 04-12-2024

https://arxiv.org/pdf/2404.07415.pdf
Grouping of $N-1$ Contingencies for Controller Synthesis

Deeper Inquiries

How could the proposed grouping method be extended to handle other types of contingencies beyond just line failures, such as generator or transformer failures

The proposed grouping method for handling line failures can be extended to address other types of contingencies, such as generator or transformer failures, by adapting the distance metrics and clustering algorithms to capture the unique dynamics associated with these events. For generator failures, the distance metrics could consider factors like the impact on system inertia, frequency response, and voltage stability. Clustering algorithms could then group contingencies based on similarities in these metrics, creating clusters of generator failure scenarios with comparable effects on the power system dynamics. Similarly, for transformer failures, the metrics could focus on parameters like impedance changes, fault currents, and voltage regulation. By incorporating these metrics into the grouping framework, the method can effectively categorize different transformer failure scenarios and design specific controllers for each group. Expanding the grouping method to handle various types of contingencies requires a thorough understanding of the specific dynamics and implications of each event on the power system. By customizing the distance metrics and clustering algorithms to suit the characteristics of generator or transformer failures, the framework can provide tailored control solutions for a broader range of contingencies.

What are the potential drawbacks or limitations of using a centralized controller architecture, and how could a decentralized or distributed control approach be incorporated into the grouping framework

Centralized controller architectures, while effective in certain scenarios, have limitations that can be addressed by incorporating decentralized or distributed control approaches into the grouping framework. One potential drawback of centralized control is the reliance on a single controller to manage the entire system, which may lead to scalability issues and increased complexity as the system size grows. Decentralized control, on the other hand, distributes control functions across multiple local controllers, allowing for more flexibility and robustness in handling contingencies. By integrating decentralized control into the grouping framework, each group of contingencies could be assigned a set of local controllers responsible for specific subsystems or components. These local controllers can communicate and coordinate with each other to ensure system-wide stability and performance in the event of a contingency. Furthermore, a distributed control approach, where decision-making is distributed among multiple agents, can enhance the resilience and adaptability of the system. By decentralizing control functions and allowing for autonomous decision-making at different levels, the grouping framework can better handle complex and dynamic power system scenarios. Incorporating decentralized or distributed control approaches into the grouping framework can improve system reliability, scalability, and responsiveness, mitigating the limitations of centralized control and enhancing the overall effectiveness of the control strategy.

Given the computational complexity of the problem, are there opportunities to leverage emerging techniques in machine learning or optimization to further improve the scalability and efficiency of the grouping and controller synthesis process

Given the computational complexity of the grouping and controller synthesis process, there are indeed opportunities to leverage emerging techniques in machine learning and optimization to enhance scalability and efficiency. Machine learning algorithms, such as clustering algorithms, reinforcement learning, or neural networks, can be utilized to automate the grouping process by identifying patterns in the contingency data and grouping contingencies based on similarities in system dynamics. These algorithms can handle large datasets efficiently and adapt to changing system conditions, improving the accuracy and effectiveness of the grouping method. Optimization techniques, such as genetic algorithms, particle swarm optimization, or convex optimization, can be applied to optimize controller parameters for each group of contingencies. By formulating the controller synthesis as an optimization problem, these techniques can efficiently search for the optimal controller settings that minimize performance metrics and ensure system stability under various contingencies. Furthermore, hybrid approaches that combine machine learning and optimization methods can offer a comprehensive solution for grouping and controller synthesis in power systems. These approaches can leverage the strengths of both techniques to achieve faster computation, better performance, and adaptive control strategies in response to changing system dynamics. By integrating advanced machine learning and optimization techniques into the grouping and controller synthesis process, the framework can be enhanced to handle larger-scale power systems, improve decision-making capabilities, and optimize control strategies for a wide range of contingencies.